AboveNet: San Francisco

Originally built as a military tank assembly plant in 1940, 365 Main Street was adopted to provide 227,000 square feet of office space for AboveNet in 2002. The concrete building renovations included the introduction of a seismic base isolation system.

Enclos provided glazing for two AboveNet locations concurrently, including the AboveNet: El Segundo location.

The LEED Gold facility at 365 Main Street is most recently known as a Digital Reality Data Center which provides interconnection capabilities and collocation spaces.

Year:

2001

Facade Area:

20,000 sq ft

Location:

San Francisco, CA

Market:

office

Height:

70 ft

Owner:

AboveNet, Inc.

General Contractor:

Hathaway Dinwiddie Construction Company

Architect:

Skidmore, Owings & Merrill